.
Enter the email you signed up with and we'll email it to you.
Commodity 2
Lorem ipsum dolor sit amet consectetur. Iaculis morbi a purus donec faucibus condime...
March 19, 2026
Commodity
Vancouver, British Columbia, March 19, 2026 (GLOBE NEWSWIRE) -- NevGold Corp. (“ NevGold ” or the “ Company ”) ( TSXV:NAU) (OTCQX:NAUFF) (Frankfurt:5E50 ) is pleased to announce further positive oxide antimony-gold drill results at its Limousine Bu
TORONTO , March 19, 2026 /CNW/ - i-80 GOLD CORP. (TSX: IAU ) (NYSE American: IAUX) ("i-80 Gold" or the "Company") announced that it has priced its previously announced offering (the "Offering") of unsecured convertible senior notes due 2031 (t
/NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO UNITED STATES WIRE SERVICES/ TORONTO , March 19, 2026 /CNW/ - Aclara Resources Inc. (" Aclara " or the " Company ") (TSX: ARA ) today announced that it intends to sell, on a n
Vancouver, British Columbia--(Newsfile Corp. - March 19, 2026) - Southern Silver Exploration Corp. (TSXV: SSV) (the "Company" or "Southern Silver") reports additional assays from drilling which further extend mineralization on the Puro Corazon clai
CALGARY, AB / ACCESS Newswire / March 19, 2026 / Mkango Resources Ltd. (AIM:MKA)(TSX-V:MKA) (the "Company" or "Mkango") is pleased to announce the results of the updated definitive feasibility study ("DFS") for the Songwe Hill Rare Earths Project ("Songwe" or the "Project") in Malawi, and results of a pre-feasibility study ("PFS") for the proposed Pulawy Rare Earths Separation Plant ("Pulawy") in Poland. Alexander Lemon, President of Mkango commented: "We are delighted to announce the results of our updated NI 43-101 DFS for the Songwe Hill Rare Earths project and the PFS results for the Pulawy Rare Earth Separation Plant. Incorporating revised rare earth pricing, capital and operating cost assumptions, these studies reflect our commitment to moving these high-quality projects forwa
/NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO UNITED STATES WIRE SERVICES/ TORONTO , March 19, 2026 /CNW/ - Aclara Resources Inc. (" Aclara " or the " Company ") (TSX: ARA ) today announced that it intends to sell, on a non-brokered private placement basis, in two tranches, 24,215,548 common shares of the Company (the " Common Shares ") for aggregate gross proceeds of US$50,000,001 (the " Private Placement ") at a price of C$2.83 per share. The Private Placement will be completed in two tranches: the first tranche (" Tranche 1 ") of 20,078,697 Common Shares for aggregate gross proceeds of US$41,458,276 that is expected to close on or around March 31, 2026; and the second tranche (" Tranche 2 ") of 4,136,851 Common Shares for aggregate gross proceeds of US$8,54
March 18, 2026
RENO, Nev., March 18, 2026 (GLOBE NEWSWIRE) -- Eagle Nuclear Energy Corp. (“Eagle” or the “Company”) (NASDAQ: NUCL), a next-generation nuclear energy company which owns the largest conventional, measured and indicated uranium deposit in the United States, today announced it has engaged global mining advisory firm, SLR International Corporation (“SLR Consulting”) as the lead permitting manager for the Aurora Uranium Project (“Aurora”), the Company’s flagship uranium asset located along the Oregon–Nevada border. SLR Consulting is world-renowned for providing technical, engineering, and environmental services to resource projects worldwide. The firm supports companies across all stages of project development, including geology, resource estimation, engineering studies, permitting, and
VANCOUVER, British Columbia, March 18, 2026 (GLOBE NEWSWIRE) -- Apollo Silver Corp. (“Apollo Silver” or the “Company”) (TSX.V:APGO, OTCQB:APGOF, Frankfurt:6ZF) is pleased to announce that it has engaged SLR Consulting (Canada) Ltd. (“SLR”), a globally recognized engineering and environmental consulting firm, to lead a Preliminary Economic Assessment (“PEA”) on the Company’s Calico Silver Project (“Calico” or the “Project”), located in San Bernardino County, California. The Project hosts one of the largest undeveloped primary silver deposits in the United States. In parallel with the PEA, Apollo Silver will advance metallurgical and geotechnical programs designed to further refine the Company’s technical understanding of the Project as it progresses forward on the development path. The
Vancouver, British Columbia--(Newsfile Corp. - March 18, 2026) - Scottie Resources Corp. (TSXV: SCOT) (OTCQB: SCTSF) (FSE: SR80) (" Scottie " or the " Company ") is pleased to announce that following the release of its successful Preliminary Economic Assessment ("PEA"), it has selected Tetra Tech Inc. ("Tetra Tech") to lead the study work for a Feasibility Study ("FS") on its on its 100% owned Scottie Gold Mine Project (Bird et al., October 28, 2025, Scottie Gold Mine Project, SEDAR+). Scottie is also pleased to report that results of its Phase 2 Ore Sorting Study confirmed positive Phase 1 results. Using production-level equipment and sample volumes as compared with Phase 1, these Phase 2 results provide a strong level of confidence in the use of DSO in this production scenario. ...
Mar 18, 2026 5:51 PM Eastern Daylight Time TORONTO--( BUSINESS WIRE )-- RPX Gold Inc. (“ RPX Gold ” or the “ Company ”) (TSXV: RPX) is pleased to announce that it has filed a National Instrument 43-101 (“ NI 43-101 ”) Technical Report supporting the Preliminary Economic Assessment (“ PEA ”) for the Company’s 100%-owned Wawa Gold Project (the “ Project ”), located in the Michipicoten Greenstone Belt of northwestern Ontario. The PEA was prepared by DRA Americas Inc. (“ DRA ”), in accordance with NI 43-101 Standards of Disclosure for Mineral Projects. All amounts are in Canadian dollars, unless otherwise stated
March 17, 2026
Vancouver, British Columbia--(Newsfile Corp. - March 17, 2026) - New Found Gold Corp. (TSXV: NFG) (NYSE American: NFGC) (" New Found Gold " or the " Company ") is pleased to announce that, further to its press release dated February 26, 2026 , the Company has filed a technical report for its 100% owned Hammerdown Gold Project (" Hammerdown "), titled: "New Found Gold Corp. Hammerdown Gold Project Preliminary Economic Assessment, Newfoundland and Labrador, Canada", with an effective date of February 18, 2026 (the " Technical Report "). The Technical Report has been filed in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (" NI 43-101 "). A copy of the Technical Report is available under the Company's SEDAR+ profile at www.sedarplus.ca and on the
ADELAIDE, AU / ACCESS Newswire / March 17, 2026 / Barton Gold Holdings Limited (ASX:BGD)(OTCQB:BGDFF)(FRA:BGD3) ( Barton or Company ) is pleased to announce the start of pit optimisation drilling at its South Australian Challenger Gold Project ( Challenger ), adjacent to its wholly-owned Central Gawler Mill ( CGM ). Foraco Drilling has been engaged for the program. A program of ~1,490m diamond drilling (DD) will generate additional geotechnical data, and sample materials for additional metallurgical testwork, to support optimisation of Challenger open pits' designs and operations. Together with ~8,000m of RC drilling program underway with Kennedy Drilling, this work is targeting conversion of existing open pit mineralisation (and new near-surface targets), to JORC (2012) ‘Indicated'
March 16, 2026
March 16, 2026 (IM - International Mining) - Ausenco has been awarded the contract to lead the Feasibility Study of the Ikkari gold project for Rupert Exploration Finland Oy, a gold exploration and development company. Located 45 km from Sodankylä in northern Finland, within the Lapland region, the Ikkari project is a grassroots discovery made in 2020 and advanced to a Pre-Feasibility Study (PFS) in early 2025. The project is now progressing toward a staged 3.5 Mt/y operation with a 20-year life-of-mine
TISDALE, SK , March 16, 2026 /CNW/ - Canadian Energy Metals Corp. ("CEM") is pleased to announce it has filed an independent technical report titled " NI 43-101 Technical Report – Thor Project, Tisdale, Saskatchewan, Canada" (" PEA ") for its 100% owned Thor Project, located in east-central Saskatchewan. The PEA, which has an effective date of August 31, 2025, is available under CEM's profile on SEDAR+ at www.sedarplus.ca . The PEA results were previously announced by CEM in its news release dated January 29, 2026, available on CEM's website at www.canadianenergymetals.com
Success!